A mixture design procedure was developed for large stone mixtureswith maximum aggregate sizes of 25 mm to 63 mm. The design proceduremakes use of existing contractor stockpile gradations with theintent of maximizing the load carrying role of the stockpile containingthe largest aggregate. Evaluative laboratory test procedures weredeveloped and tested. A full scale test pavement demonstratedthe effectiveness of the procedure.